Onshore wind · United Kingdom
Longlands Lane
Operator Renewable Energy Systems (RES)
Operational1.5 MWData checked 16 November 2026Source record dated 29 May 2015
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Longlands Lane is a 1.5 MW wind farm 6 km south of Cwmafan, Gwent, United Kingdom. Its planning application (12/1001) went to Neath Port Talbot on 30 October 2012 and was granted on 6 November 2013. It has been operating since 1 December 2014. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 34 other energy sites within 10 km, 11 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Longlands Lane changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 1.5 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Renewable Energy Systems (RES)
- Location
- Longlands Lane, Margam, nr junction 38 of the M4., Gwent, United Kingdom
- Planning authority
- Neath Port Talbot
- Planning application
- 12/1001
- First operating
- 2014
- Turbines
- 1
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 12/1001, with what the planning evidence pack adds for this site.
Every application in Neath Port Talbot · Alerts for applications and incidents near here
Timeline
- 30 October 2012 Planning application submitted
- 6 November 2013 Planning permission granted
- 30 September 2014 Construction started
- 1 December 2014 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Longlands Lane. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Longlands Lane had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Longlands Lane; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Longlands Lane?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 29 May 2015.
- Where is Longlands Lane?
- 6 km south of Cwmafan, Gwent, United Kingdom.