Solar · United Kingdom

Margam - Solar panels

Operator Infinite Renewables Group Limited

Awaiting Construction0.4 MWData checked 16 November 2026Source record dated 27 June 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Margam - Solar panels is a 0.4 MW solar farm 3.2 km north-west of Pyle, West Glamorgan, United Kingdom. Its planning application (P2022/0477) went to Neath Port Talbot on 17 June 2022 and was granted on 21 July 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 25 other energy sites within 10 km, 9 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

INFINITE RENEWABLES GROUP LIMITED (09646125), active, since 2015. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Margam - Solar panels sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1453, Fire crews tackle solar panel unit blaze in Burnham-On-Sea, 62 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14532026Fire crews tackle solar panel unit blaze in Burnham-On-Sea62 kmMinor
EIR-14162025Fire at Bristol hospital started in solar panels80 kmSignificant
EIR-12742022Fire damages rooftop solar panels at We The Curious in Bristol80 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
0.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Infinite Renewables Group Limited
Location
Unit 36 Kenfig Industrial Estate Road Margam, West Glamorgan, SA13 2PE, United Kingdom
Planning authority
Neath Port Talbot
Planning application
P2022/0477

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P2022/0477, with what the planning evidence pack adds for this site.

Every application in Neath Port Talbot · Alerts for applications and incidents near here

  • 17 June 2022 Planning application submitted
  • 21 July 2022 Planning permission granted
  • 21 July 2027 Planning permission runs out

None found. The register holds no published incident that names Margam - Solar panels. If you know of one, report it (confidential reports are anonymised).

Has Margam - Solar panels had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Margam - Solar panels; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Margam - Solar panels?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 27 June 2022.
Where is Margam - Solar panels?
3.2 km north-west of Pyle, West Glamorgan, United Kingdom (postcode SA13 2PE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).