Mazelands Farm

Operator Anesco · Owner Quanesco Midco Limited

Application Refused2.8 MWData checked 16 November 2026Source record dated 4 May 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Mazelands Farm is a 2.8 MW solar farm 7.7 km north-east of Thatcham, Berkshire, United Kingdom. Its planning application (15/02076/COMIND) went to West Berkshire on 10 September 2015 and was refused on 22 April 2016. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 21 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 63 other sites and 443 energy sites within 40 km for Mazelands Farm

Members see the sites and incidents around this one, and every record behind them.

ANESCO LIMITED (07443091), active, since 2010. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
2.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Anesco
Owner
Quanesco Midco Limited
Location
Mazelands Farm, Burnt Hill Road, Stanford Dingley, Reading, Berkshire, RG7 6DU, United Kingdom
Planning authority
West Berkshire
Planning application
15/02076/COMIND

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/02076/COMIND, with what the planning evidence pack adds for this site.

Every application in West Berkshire · Alerts for applications and incidents near here

  • 10 September 2015 Planning application submitted
  • 22 April 2016 Planning permission refused

None found. The register holds no published incident that names Mazelands Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Mazelands Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Mazelands Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Mazelands Farm?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 4 May 2016.
Where is Mazelands Farm?
7.7 km north-east of Thatcham, Berkshire, United Kingdom (postcode RG7 6DU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).