Solar · United Kingdom

Marchington Solar Farm

Operator Trina Solar

Operational4.3 MWData checked 16 November 2026Source record dated 31 August 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Marchington Solar Farm is a 4.3 MW solar farm 3.2 km south-east of Uttoxeter, Staffordshire, United Kingdom. Its planning application (P/2014/00825) went to East Staffordshire on 10 July 2014 and was granted on 15 October 2014. It has been operating since 23 March 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 21 other energy sites within 10 km, 16 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 6 other sites and 517 energy sites within 40 km for Marchington Solar Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
4.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Trina Solar
Location
Moisty Lane Marchington Staffordshire, Staffordshire, United Kingdom
Planning authority
East Staffordshire
Planning application
P/2014/00825
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P/2014/00825, with what the planning evidence pack adds for this site.

Every application in East Staffordshire · Alerts for applications and incidents near here

  • 10 July 2014 Planning application submitted
  • 15 October 2014 Planning permission granted
  • 15 November 2015 Construction started
  • 23 March 2016 Operational

None found. The register holds no published incident that names Marchington Solar Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Marchington Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Marchington Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Marchington Solar Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 31 August 2016.
Where is Marchington Solar Farm?
3.2 km south-east of Uttoxeter, Staffordshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).