Solar · United Kingdom

Marchington Solar Park

Operator Evans Group

Abandoned4.2 MWData checked 16 November 2026Source record dated 17 December 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Marchington Solar Park is a 4.2 MW solar farm 5.9 km south-east of Uttoxeter, Staffordshire, United Kingdom. Its planning application (P/2010/01499/JI) went to East Staffordshire on 6 January 2011 and was granted on 2 August 2013. Its status in the Renewable Energy Planning Database (UK government) is abandoned. There are 18 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

560 energy sites within 40 km for Marchington Solar Park

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
4.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Abandoned
Operator or applicant
Evans Group
Location
Former Barracks, Land off Stubby Lane, Marchington, Staffordshire, Staffordshire, ST14 8LX, United Kingdom
Planning authority
East Staffordshire
Planning application
P/2010/01499/JI

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P/2010/01499/JI, with what the planning evidence pack adds for this site.

Every application in East Staffordshire · Alerts for applications and incidents near here

  • 6 January 2011 Planning application submitted
  • 2 August 2013 Planning permission granted
  • 2 August 2016 Planning permission expired

None found. The register holds no published incident that names Marchington Solar Park. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Marchington Solar Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Marchington Solar Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Marchington Solar Park?
Abandoned, in the Renewable Energy Planning Database (UK government), where it last changed on 17 December 2015.
Where is Marchington Solar Park?
5.9 km south-east of Uttoxeter, Staffordshire, United Kingdom (postcode ST14 8LX).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).