Land off Ford Lane

Operator Trina Solar

Operational4.7 MWData checked 16 November 2026Source record dated 1 February 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land off Ford Lane is a 4.7 MW solar farm 7.1 km south-east of West Kingsdown, Kent, United Kingdom. Its planning application (15/02431/FL) went to Tonbridge and Malling on 23 July 2015 and was granted on 30 November 2015. It has been operating since 17 November 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 21 other energy sites within 10 km, 11 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 6 other sites and 623 energy sites within 40 km for Land off Ford Lane

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
4.7 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Trina Solar
Location
Land Between M20 And M26 West, Ford Lane, Wrotham Heath, Sevenoaks, Kent, TN15 7, United Kingdom
Planning authority
Tonbridge and Malling
Planning application
15/02431/FL
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/02431/FL, with what the planning evidence pack adds for this site.

Every application in Tonbridge and Malling · Alerts for applications and incidents near here

  • 23 July 2015 Planning application submitted
  • 30 November 2015 Planning permission granted
  • 1 April 2016 Construction started
  • 17 November 2016 Operational

None found. The register holds no published incident that names Land off Ford Lane. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land off Ford Lane had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land off Ford Lane; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land off Ford Lane?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 1 February 2017.
Where is Land off Ford Lane?
7.1 km south-east of West Kingsdown, Kent, United Kingdom (postcode TN15 7).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).