Solar · United Kingdom

Langar Lane

Operator Kappa Solar& OPDE

Operational10 MWData checked 16 November 2026Source record dated 15 December 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Langar Lane is a 10 MW solar farm 5.3 km south of Bingham, Nottinghamshire, United Kingdom. Its planning application (14/01594/FUL) went to Rushcliffe on 6 August 2014 and was granted on 5 December 2014. It has been operating since 15 June 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 24 other energy sites within 10 km, 20 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

543 energy sites within 40 km for Langar Lane

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
10 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Kappa Solar& OPDE
Location
OS Fields 6230 And 7657 Langar Lane, Colston, Bassett, Nottinghamshire, United Kingdom
Planning authority
Rushcliffe
Planning application
14/01594/FUL
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/01594/FUL, with what the planning evidence pack adds for this site.

Every application in Rushcliffe · Alerts for applications and incidents near here

  • 6 August 2014 Planning application submitted
  • 5 December 2014 Planning permission granted
  • 5 October 2015 Construction started
  • 15 June 2016 Operational

None found. The register holds no published incident that names Langar Lane. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Langar Lane had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Langar Lane; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Langar Lane?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 15 December 2017.
Where is Langar Lane?
5.3 km south of Bingham, Nottinghamshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).