← Back to Cumbria

Solar · United Kingdom

Land at Wreay

Operator Anesco · Owner Quanesco Midco Limited

Operational5 MWData checked 16 November 2026Source record dated 31 May 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land at Wreay is a 5 MW solar farm 8.8 km south of Carlisle, Cumbria, United Kingdom. Its planning application (15/0653) went to Westmorland and Furness on 31 July 2015 and was granted on appeal on 4 August 2016. It has been operating since 29 March 2017. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 18 other energy sites within 10 km, 8 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 63 other sites and 124 energy sites within 40 km for Land at Wreay

Members see the sites and incidents around this one, and every record behind them.

ANESCO LIMITED (07443091), active, since 2010. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Anesco
Owner
Quanesco Midco Limited
Location
Land At Wreay, Calthwaite, Penrith, Carlisle, Cumbria, CA4 0PY, United Kingdom
Planning authority
Westmorland and Furness
Planning application
15/0653
Appeal reference
APP/H0928/W/15/3140750
First operating
2017

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/0653, with what the planning evidence pack adds for this site.

Every application in Westmorland and Furness · Alerts for applications and incidents near here

  • 31 July 2015 Planning application submitted
  • 29 October 2015 Planning permission refused
  • 12 January 2016 Appeal lodged
  • 4 August 2016 Planning permission granted
  • 4 August 2016 Appeal granted
  • 15 December 2016 Construction started
  • 29 March 2017 Operational

None found. The register holds no published incident that names Land at Wreay. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land at Wreay had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land at Wreay; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land at Wreay?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 31 May 2017.
Where is Land at Wreay?
8.8 km south of Carlisle, Cumbria, United Kingdom (postcode CA4 0PY).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).