Head Dale, Cocklakes - Micro Energy Storage Project

Operator AMP Clean Energy · Owner Aggregated Micro Power Holdings Limited

Application Refused0.2 MWData checked 16 November 2026Source record dated 22 September 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Head Dale, Cocklakes - Micro Energy Storage Project is a 0.2 MW battery storage site 7.1 km south-east of Carlisle, Cumbria, United Kingdom. Its planning application (26/0301) went to Cumberland on 4 June 2026 and was refused on 16 September 2026. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 10 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

The operator's 382 other sites and 127 energy sites within 40 km for Head Dale, Cocklakes - Micro Energy Storage Project

Members see the sites and incidents around this one, and every record behind them.

AMP CLEAN ENERGY LIMITED (11320925), active, since 2018. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Battery storage (Stand-alone Storage)
Capacity
0.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
AMP Clean Energy
Owner
Aggregated Micro Power Holdings Limited
Location
South west of Head Dale and The Stripes, Cocklakes, Cumwhinton, Cumbria, CA4 0AW, United Kingdom
Planning authority
Cumberland
Planning application
26/0301

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 26/0301, with what the planning evidence pack adds for this site.

Every application in Cumberland · Alerts for applications and incidents near here

Status changed from Application Submitted to Application Refused on 16 November 2026.

  • 4 June 2026 Planning application submitted
  • 16 September 2026 Planning permission refused

None found. The register holds no published incident that names Head Dale, Cocklakes - Micro Energy Storage Project. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Head Dale, Cocklakes - Micro Energy Storage Project had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Head Dale, Cocklakes - Micro Energy Storage Project; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Head Dale, Cocklakes - Micro Energy Storage Project?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 16 November 2026.
Where is Head Dale, Cocklakes - Micro Energy Storage Project?
7.1 km south-east of Carlisle, Cumbria, United Kingdom (postcode CA4 0AW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).