Solar · United Kingdom
Land at Moss Farm (North)
Operator TGC Renewables/NESF
Planning Permission Expired6 MWData checked 16 November 2026Source record dated 3 September 2020
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Land at Moss Farm (North) is a 6 MW solar farm 3.6 km north of Crewe, Cheshire, United Kingdom. Its planning application (15/2113N) went to Cheshire East on 8 May 2015 and was granted on 20 May 2016. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 39 other energy sites within 10 km, 33 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Land at Moss Farm (North) changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 6 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Planning Permission Expired
- Operator or applicant
- TGC Renewables/NESF
- Location
- Land at Moss Farm, Warmingham, Cheshire, CW1 4PW, United Kingdom
- Planning authority
- Cheshire East
- Planning application
- 15/2113N
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 15/2113N, with what the planning evidence pack adds for this site.
Every application in Cheshire East · Alerts for applications and incidents near here
Timeline
- 8 May 2015 Planning application submitted
- 20 May 2016 Planning permission granted
- 20 May 2019 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Land at Moss Farm (North). If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Land at Moss Farm (North) had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Land at Moss Farm (North); it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Land at Moss Farm (North)?
- Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 3 September 2020.
- Where is Land at Moss Farm (North)?
- 3.6 km north of Crewe, Cheshire, United Kingdom (postcode CW1 4PW).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).