← Back to Clwyd

Solar · United Kingdom

Land south of Francis Land

Operator TGC Renewables/NESF

Planning Permission Expired10 MWData checked 16 November 2026Source record dated 3 September 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land south of Francis Land is a 10 MW solar farm 5.1 km south-east of Gresford, Clwyd, United Kingdom. Its planning application (P/2015/0396) went to Wrexham on 27 May 2015 and was granted on appeal on 13 September 2016. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 25 other energy sites within 10 km, 14 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 3 other sites and 322 energy sites within 40 km for Land south of Francis Land

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
10 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
TGC Renewables/NESF
Location
Land South Of, Francis Lane, Holt, Wrexham, Clwyd, Clwyd, LL13 9Y, United Kingdom
Planning authority
Wrexham
Planning application
P/2015/0396
Appeal reference
APP/H6955/A/16/3147767

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P/2015/0396, with what the planning evidence pack adds for this site.

Every application in Wrexham · Alerts for applications and incidents near here

  • 27 May 2015 Planning application submitted
  • 7 December 2015 Planning permission refused
  • 6 June 2016 Appeal lodged
  • 13 September 2016 Planning permission granted
  • 13 September 2016 Appeal granted
  • 13 September 2021 Planning permission expired

None found. The register holds no published incident that names Land south of Francis Land. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land south of Francis Land had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land south of Francis Land; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land south of Francis Land?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 3 September 2020.
Where is Land south of Francis Land?
5.1 km south-east of Gresford, Clwyd, United Kingdom (postcode LL13 9Y).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).