Solar · United Kingdom
Land south of Francis Land
Operator TGC Renewables/NESF
Planning Permission Expired10 MWData checked 16 November 2026Source record dated 3 September 2020
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Land south of Francis Land is a 10 MW solar farm 5.1 km south-east of Gresford, Clwyd, United Kingdom. Its planning application (P/2015/0396) went to Wrexham on 27 May 2015 and was granted on appeal on 13 September 2016. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 25 other energy sites within 10 km, 14 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Land south of Francis Land changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Solar
- Capacity
- 10 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Planning Permission Expired
- Operator or applicant
- TGC Renewables/NESF
- Location
- Land South Of, Francis Lane, Holt, Wrexham, Clwyd, Clwyd, LL13 9Y, United Kingdom
- Planning authority
- Wrexham
- Planning application
- P/2015/0396
- Appeal reference
- APP/H6955/A/16/3147767
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P/2015/0396, with what the planning evidence pack adds for this site.
Every application in Wrexham · Alerts for applications and incidents near here
Timeline
- 27 May 2015 Planning application submitted
- 7 December 2015 Planning permission refused
- 6 June 2016 Appeal lodged
- 13 September 2016 Planning permission granted
- 13 September 2016 Appeal granted
- 13 September 2021 Planning permission expired
Incidents on the register at this site
None found. The register holds no published incident that names Land south of Francis Land. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Land south of Francis Land had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Land south of Francis Land; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Land south of Francis Land?
- Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 3 September 2020.
- Where is Land south of Francis Land?
- 5.1 km south-east of Gresford, Clwyd, United Kingdom (postcode LL13 9Y).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).