← Back to Clwyd

Solar · United Kingdom

Land at Borras Hall

Operator Earthworm& EW Capital

Abandoned10 MWData checked 16 November 2026Source record dated 20 November 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land at Borras Hall is a 10 MW solar farm on the edge of Gresford, Clwyd, United Kingdom. Its planning application (P/2015/0777) went to Wrexham on 28 October 2015 and was granted on 11 March 2016. Its status in the Renewable Energy Planning Database (UK government) is abandoned. There are 29 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 5 other sites and 330 energy sites within 40 km for Land at Borras Hall

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
10 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Abandoned
Operator or applicant
Earthworm& EW Capital
Location
Land T The West And North Of, Borras Hall Lane, Llan-y-Pwll, Wrexham, Clwyd, Wales, Clwyd, LL13 9, United Kingdom
Planning authority
Wrexham
Planning application
P/2015/0777

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P/2015/0777, with what the planning evidence pack adds for this site.

Every application in Wrexham · Alerts for applications and incidents near here

  • 28 October 2015 Planning application submitted
  • 11 March 2016 Planning permission granted
  • 11 March 2021 Planning permission expired

None found. The register holds no published incident that names Land at Borras Hall. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Land at Borras Hall had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land at Borras Hall; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land at Borras Hall?
Abandoned, in the Renewable Energy Planning Database (UK government), where it last changed on 20 November 2018.
Where is Land at Borras Hall?
On the edge of Gresford, Clwyd, United Kingdom (postcode LL13 9).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).