← Back to Flintshire

Solar · United Kingdom

Celyn Farm

Operator Earthworm& EW Capital

Abandoned5 MWData checked 16 November 2026Source record dated 16 October 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Celyn Farm is a 5 MW solar farm 3.9 km south-west of Buckley, Flintshire, United Kingdom. Its planning application (54041) went to Flintshire on 29 October 2015 and was granted on 2 August 2016. Its status in the Renewable Energy Planning Database (UK government) is abandoned. There are 10 other energy sites within 10 km, 7 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 5 other sites and 338 energy sites within 40 km for Celyn Farm

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Abandoned
Operator or applicant
Earthworm& EW Capital
Location
Celyn Farm Stryt-Cae-Rhedyn, Leeswood, Mold, Clwyd, Wales, Flintshire, CH7 4AG, United Kingdom
Planning authority
Flintshire
Planning application
54041

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 54041, with what the planning evidence pack adds for this site.

Every application in Flintshire · Alerts for applications and incidents near here

  • 29 October 2015 Planning application submitted
  • 2 August 2016 Planning permission granted

None found. The register holds no published incident that names Celyn Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Celyn Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Celyn Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Celyn Farm?
Abandoned, in the Renewable Energy Planning Database (UK government), where it last changed on 16 October 2017.
Where is Celyn Farm?
3.9 km south-west of Buckley, Flintshire, United Kingdom (postcode CH7 4AG).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).