Planning application · Solar · Cheshire East

Land at Moss Farm (North)

Planning Permission Expired6 MWApplication 15/2113NSubmitted 8 May 2015Granted 20 May 2016

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
15/2113N
Planning authority
Cheshire East
County or area
Cheshire
Nation
England
Technology
Solar
Capacity
6 MW
Status
Planning Permission Expired
Operator or applicant
TGC Renewables/NESF
Location
Land at Moss Farm, Warmingham, CW1 4PW
  • 8 May 2015 Planning application submitted
  • 20 May 2016 Planning permission granted
  • 20 May 2019 Planning permission expired

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1485, Faulty solar panel wiring sparks house fire in Stoke-on-Trent, 20 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent20 kmMinor
EIR-15462025Solar panel isolation switch overheats in roof fire at a house in Bucknall23 kmMinor
EIR-15532017Roof fire involving 14 solar panels attended in Shropshire25 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near CW1 4PW is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Cheshire East.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.