Battery storage · United Kingdom
Land at Court Farm
Operator Enso Energy · Owner Priory Energy Limited
Appeal RefusedData checked 16 November 2026Source record dated 25 September 2019
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Land at Court Farm is a battery storage site 5.4 km north of Salisbury, Wiltshire, United Kingdom. Its planning application (18/00457/FUL) went to Wiltshire on 17 January 2018 and was refused on appeal on 17 June 2019. Its status in the Renewable Energy Planning Database (UK government) is appeal refused. There are 23 other energy sites within 10 km, 4 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Land at Court Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
ENSO ENERGY LIMITED (09892057), active, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Battery storage (Stand-alone Storage)
- Status
- Appeal Refused
- Operator or applicant
- Enso Energy
- Owner
- Priory Energy Limited
- Location
- Land at Court Farm Court Farm LOWER WOODFORD, Wiltshire, SP4 6NQ, United Kingdom
- Planning authority
- Wiltshire
- Planning application
- 18/00457/FUL
- Appeal reference
- APP/Y3940/W/18/3213367
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 18/00457/FUL, with what the planning evidence pack adds for this site.
Every application in Wiltshire · Alerts for applications and incidents near here
Timeline
- 17 January 2018 Planning application submitted
- 27 February 2019 Appeal lodged
- 17 June 2019 Appeal refused
Incidents on the register at this site
None found. The register holds no published incident that names Land at Court Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Land at Court Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Land at Court Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Land at Court Farm?
- Appeal Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 25 September 2019.
- Where is Land at Court Farm?
- 5.4 km north of Salisbury, Wiltshire, United Kingdom (postcode SP4 6NQ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).