Solar · United Kingdom
Chemring Countermeasures Limited, Netton - Solar Panels
Application Refused0.3 MWChecked 6 October 2026Last changed in the dataset 31 March 2026
The site
- Technology
- Solar
- Capacity
- 0.3 MW
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Chemring Countermeasures
- Location
- Chemring Countermeasures Ltd, Netton, Wiltshire, SP4 6AS, United Kingdom
- Planning authority
- Wiltshire
- Planning application
- PL/2025/09805
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
Timeline
- 24 December 2025 Planning application submitted
- 12 February 2026 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Chemring Countermeasures Limited, Netton - Solar Panels. If you know of one, report it (confidential reports are anonymised).
Follow Chemring Countermeasures Limited, Netton - Solar Panels
Get one email when this site's status changes in the Renewable Energy Planning Database (UK government), or when the register publishes an incident that names it. Free, no account needed, unsubscribe in one click.
By following you agree to the privacy policy.
Incidents at solar farms in the United Kingdom
The register holds 86 incidents at solar farms in the United Kingdom, 59 of them fires, and 344 worldwide. Counts of incidents in published reporting, not rates.
- Fire involving solar panels at a Market Harborough house spreads to an adjoining property
- Solar inverter fire on agricultural building in Shropshire
- Fire damages solar panel batteries in a Teignmouth garage
- Fire damages roof with one solar panel in The Charltons
- Solar panels on flat roof alight at terraced building in Newquay
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.