Solar · United Kingdom

Chemring Countermeasures Limited, High Post Road- Solar Array

Operator The Logical Group

Awaiting ConstructionData checked 16 November 2026Source record dated 8 July 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Chemring Countermeasures Limited, High Post Road- Solar Array is a solar farm 5.1 km south of Amesbury, Wiltshire, United Kingdom. Its planning application (PL/2023/04203) went to Wiltshire on 16 June 2023 and was granted on 6 June 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 22 other energy sites within 10 km, 17 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Chemring Countermeasures Limited, High Post Road- Solar Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1964, Fire damages solar panels at Verwood farm during heatwave, 28 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-19642022Fire damages solar panels at Verwood farm during heatwave28 kmSignificant
EIR-15342022Storm Eunice loosens solar panels on Eastleigh flats36 kmMinor
EIR-15322023Roof-space fire involving a solar inverter at a house in Ferndown37 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
The Logical Group
Location
Chapel At Netton East C292 To High Post Road, Salisbury, Wiltshire, SP4 6AS, United Kingdom
Planning authority
Wiltshire
Planning application
PL/2023/04203

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PL/2023/04203, with what the planning evidence pack adds for this site.

Every application in Wiltshire · Alerts for applications and incidents near here

  • 16 June 2023 Planning application submitted
  • 6 June 2024 Planning permission granted

None found. The register holds no published incident that names Chemring Countermeasures Limited, High Post Road- Solar Array. If you know of one, report it (confidential reports are anonymised).

Has Chemring Countermeasures Limited, High Post Road- Solar Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Chemring Countermeasures Limited, High Post Road- Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Chemring Countermeasures Limited, High Post Road- Solar Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 July 2024.
Where is Chemring Countermeasures Limited, High Post Road- Solar Array?
5.1 km south of Amesbury, Wiltshire, United Kingdom (postcode SP4 6AS).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).