Solar · United Kingdom

Ladywood Farm

Operator Global Renewable Construction

Application Refused5 MWData checked 16 November 2026Source record dated 5 November 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Ladywood Farm is a 5 MW solar farm on the edge of West Hallam, Derbyshire, United Kingdom. Its planning application (0915/0023) went to Erewash on 10 September 2015 and was refused on 28 October 2015. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 56 other energy sites within 10 km, 44 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 6 other sites and 595 energy sites within 40 km for Ladywood Farm

Members see the sites and incidents around this one, and every record behind them.

GLOBAL RENEWABLE CONSTRUCTION LIMITED (09039761), dissolved, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Global Renewable Construction
Location
Ladywood Farm, Ladywood Road, Dale Abbey, Ilkeston, Derbyshire, DE7 4PT, United Kingdom
Planning authority
Erewash
Planning application
0915/0023

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 0915/0023, with what the planning evidence pack adds for this site.

Every application in Erewash · Alerts for applications and incidents near here

  • 10 September 2015 Planning application submitted
  • 28 October 2015 Planning permission refused

None found. The register holds no published incident that names Ladywood Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Ladywood Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Ladywood Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Ladywood Farm?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 5 November 2015.
Where is Ladywood Farm?
On the edge of West Hallam, Derbyshire, United Kingdom (postcode DE7 4PT).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).