Solar · United Kingdom

Land Off Penniment Lane

Operator Global Renewable Construction

Revised5 MWData checked 16 November 2026Source record dated 2 December 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Land Off Penniment Lane is a 5 MW solar farm 3.4 km west of Mansfield Woodhouse, Nottinghamshire, United Kingdom. Its planning application (2015/0400/ST) went to Mansfield on 2 July 2015 and was refused on 20 November 2015. Its status in the Renewable Energy Planning Database (UK government) is revised. There are 61 other energy sites within 10 km, 42 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

GLOBAL RENEWABLE CONSTRUCTION LIMITED (09039761), dissolved, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Land Off Penniment Lane sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1265, Solar panels catch fire and destroy three buildings in Harby, 39 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12652024Solar panels catch fire and destroy three buildings in Harby39 kmSignificant
EIR-15522023Fire starts in solar panels on commercial roof in Doncaster40 kmSignificant
EIR-21512018Sunlight reflected from a shed solar panel believed to have started a house fire in Thurnby Lodge58 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Revised
Operator or applicant
Global Renewable Construction
Location
Land Off, Penniment Lane, Mansfield, Nottinghamshire, NG19 6PH, United Kingdom
Planning authority
Mansfield
Planning application
2015/0400/ST

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2015/0400/ST, with what the planning evidence pack adds for this site.

Every application in Mansfield · Alerts for applications and incidents near here

  • 2 July 2015 Planning application submitted
  • 20 November 2015 Planning permission refused

None found. The register holds no published incident that names Land Off Penniment Lane. If you know of one, report it (confidential reports are anonymised).

Has Land Off Penniment Lane had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Land Off Penniment Lane; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Land Off Penniment Lane?
Revised, in the Renewable Energy Planning Database (UK government), where it last changed on 2 December 2015.
Where is Land Off Penniment Lane?
3.4 km west of Mansfield Woodhouse, Nottinghamshire, United Kingdom (postcode NG19 6PH).