Solar · United Kingdom

Penniment House Farm/Water Lane Farm

Operator Global Renewable Construction

Application Refused4 MWData checked 16 November 2026Source record dated 27 May 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Penniment House Farm/Water Lane Farm is a 4 MW solar farm 3.1 km west of Mansfield Woodhouse, Nottinghamshire, United Kingdom. Its planning application (2016/0063/ST) went to Mansfield on 8 February 2016 and was refused on 9 May 2016. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 60 other energy sites within 10 km, 41 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 6 other sites and 619 energy sites within 40 km for Penniment House Farm/Water Lane Farm

Members see the sites and incidents around this one, and every record behind them.

GLOBAL RENEWABLE CONSTRUCTION LIMITED (09039761), dissolved, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Global Renewable Construction
Location
Land Off, Penniment Lane, Mansfield, Nottinghamshire, NG19 6PH, United Kingdom
Planning authority
Mansfield
Planning application
2016/0063/ST

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2016/0063/ST, with what the planning evidence pack adds for this site.

Every application in Mansfield · Alerts for applications and incidents near here

  • 8 February 2016 Planning application submitted
  • 9 May 2016 Planning permission refused

None found. The register holds no published incident that names Penniment House Farm/Water Lane Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Penniment House Farm/Water Lane Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Penniment House Farm/Water Lane Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Penniment House Farm/Water Lane Farm?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 27 May 2016.
Where is Penniment House Farm/Water Lane Farm?
3.1 km west of Mansfield Woodhouse, Nottinghamshire, United Kingdom (postcode NG19 6PH).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).