← Back to Avon

Onshore wind · United Kingdom

Ingst Hill Wind Farm/ M48 Wind Farm

Operator REG Windpower

Appeal Withdrawn5.2 MWData checked 16 November 2026Source record dated 29 October 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Ingst Hill Wind Farm/ M48 Wind Farm is a 5.2 MW wind farm 6.5 km south-west of Thornbury, Avon, United Kingdom. Its planning application (PT12/4071/F) went to South Gloucestershire on 5 December 2012 and was refused on 17 December 2014. Its status in the Renewable Energy Planning Database (UK government) is appeal withdrawn. There are 96 other energy sites within 10 km, 6 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 22 other sites and 537 energy sites within 40 km for Ingst Hill Wind Farm/ M48 Wind Farm

Members see the sites and incidents around this one, and every record behind them.

REG WINDPOWER LIMITED (02431173), active, since 1989. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
5.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Appeal Withdrawn
Operator or applicant
REG Windpower
Location
Land At Valley Farm Ingst Hill Olveston Bristol South Gloucestershire, Avon, BS35 4AP, United Kingdom
Planning authority
South Gloucestershire
Planning application
PT12/4071/F
Appeal reference
APP/P0119/W/15/3100557
Turbines
2

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for PT12/4071/F, with what the planning evidence pack adds for this site.

Every application in South Gloucestershire · Alerts for applications and incidents near here

  • 5 December 2012 Planning application submitted
  • 17 December 2014 Planning permission refused
  • 27 July 2015 Appeal lodged
  • 29 October 2015 Appeal withdrawn

None found. The register holds no published incident that names Ingst Hill Wind Farm/ M48 Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Ingst Hill Wind Farm/ M48 Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Ingst Hill Wind Farm/ M48 Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Ingst Hill Wind Farm/ M48 Wind Farm?
Appeal Withdrawn, in the Renewable Energy Planning Database (UK government), where it last changed on 29 October 2015.
Where is Ingst Hill Wind Farm/ M48 Wind Farm?
6.5 km south-west of Thornbury, Avon, United Kingdom (postcode BS35 4AP).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).