Planning pack for this site, £295Other options

Solar · United Kingdom

Cattybrook Solar Farm

Operator Luminous Energy Limited

Awaiting Construction49.9 MWData checked 16 November 2026Source record dated 16 February 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Cattybrook Solar Farm is a 49.9 MW solar farm 5.4 km north-west of Stoke Gifford, Gloucestershire, United Kingdom. Its planning application (P23/03430/F) went to South Gloucestershire on 13 December 2023 and was granted on 17 April 2025. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 98 other energy sites within 10 km, 57 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

LUMINOUS ENERGY GROUP LIMITED (08416646), active, since 2013. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Cattybrook Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1416, Fire at Bristol hospital started in solar panels, 12 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14162025Fire at Bristol hospital started in solar panels12 kmSignificant
EIR-12742022Fire damages rooftop solar panels at We The Curious in Bristol12 kmSignificant
EIR-20652021Loft fire believed caused by a solar panel at Paintworks flats in Bristol13 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
49.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Luminous Energy Limited
Location
Near Boardinghouse Lane Almondsbury, Gloucestershire, BS32 4ES, United Kingdom
Planning authority
South Gloucestershire
Planning application
P23/03430/F

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for P23/03430/F, with what the planning evidence pack adds for this site.

Every application in South Gloucestershire · Alerts for applications and incidents near here

  • 13 December 2023 Planning application submitted
  • 17 April 2025 Planning permission granted

None found. The register holds no published incident that names Cattybrook Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Cattybrook Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Cattybrook Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Cattybrook Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 16 February 2026.
Where is Cattybrook Solar Farm?
5.4 km north-west of Stoke Gifford, Gloucestershire, United Kingdom (postcode BS32 4ES).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).