← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Onshore wind · South Gloucestershire

Ingst Hill Wind Farm/ M48 Wind Farm

Appeal Withdrawn5.2 MWApplication PT12/4071/FSubmitted 5 December 2012Appeal withdrawn 29 October 2015

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
PT12/4071/F
Planning authority
South Gloucestershire
County or area
Avon
Nation
England
Technology
Onshore wind
Capacity
5.2 MW
Status
Appeal Withdrawn
Operator or applicant
REG Windpower
Location
Land At Valley Farm Ingst Hill Olveston Bristol South Gloucestershire, BS35 4AP
Appeal reference
APP/P0119/W/15/3100557
Turbines
2
  • 5 December 2012 Planning application submitted
  • 17 December 2014 Planning permission refused
  • 27 July 2015 Appeal lodged
  • 29 October 2015 Appeal withdrawn

The pack for this site lists 43 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-0794, Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch, 60 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-07942022Wind turbine collapses at Pant-y-Wal wind farm near Gilfach Goch60 kmSignificant
EIR-07902022Nordex attributes a Welsh wind turbine collapse to an overspeed condition111 kmMajor
EIR-08742026Turbine blade detaches at RWE's Brechfa Forest West wind farm in Wales116 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 40 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near BS35 4AP is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in South Gloucestershire.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.