← Back to Highland

Onshore wind · United Kingdom

Hill of Lybster

Operator Fivestone Ltd (subsidiary of Abbey Produce)

Operational4.9 MWData checked 16 November 2026Source record dated 9 June 2010

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Hill of Lybster is a 4.9 MW wind farm 9.5 km west of Thurso, Highland, United Kingdom. Its planning application (CA2001030) went to Highland on 28 April 2000 and was granted on 22 June 2001. It has been operating since 8 February 2003. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 26 other energy sites within 10 km, 15 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

128 energy sites within 40 km for Hill of Lybster

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
4.9 MW (this record)
All phases
6.4 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Fivestone Ltd (subsidiary of Abbey Produce)
Location
Forss Phase 2, Caithness, Highland, United Kingdom
Planning authority
Highland
Planning application
CA2001030
First operating
2003
Turbines
4

This record is 4.9 MW, one part of a site built in phases. With Hill of Lybster (Wind Turbine - Extension) (1.5 MW) the phases on the register add up to 6.4 MW. Hill of Lybster (Wind Turbine - Extension)

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for CA2001030, with what the planning evidence pack adds for this site.

Every application in Highland · Alerts for applications and incidents near here

  • 28 April 2000 Planning application submitted
  • 22 June 2001 Planning permission granted
  • 8 February 2003 Operational

None found. The register holds no published incident that names Hill of Lybster. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Hill of Lybster had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Hill of Lybster; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Hill of Lybster?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 9 June 2010.
Where is Hill of Lybster?
9.5 km west of Thurso, Highland, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).