Onshore wind · United Kingdom

Forss Wind Farm (Extension)

Operator Renewable Energy Systems (RES)

Operational5.2 MWData checked 16 November 2026Source record dated 10 May 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Forss Wind Farm (Extension) is a 5.2 MW wind farm 9.5 km west of Thurso, Highland, United Kingdom. Its planning application (01/00380/FULCA) went to Highland on 5 January 2005 and was granted on 16 October 2006. It has been operating since 1 July 2007. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 26 other energy sites within 10 km, 15 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 80 other sites and 128 energy sites within 40 km for Forss Wind Farm (Extension)

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
5.2 MW (this record)
All phases
7.8 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Renewable Energy Systems (RES)
Location
Ex Navy Base Forss, Dounreay Thurso Caithness, Highland, KW14 7YB, United Kingdom
Planning authority
Highland
Planning application
01/00380/FULCA
First operating
2007
Turbines
4

This record is 5.2 MW, one part of a site built in phases. With Forss Wind Farm (2.6 MW) the phases on the register add up to 7.8 MW. Forss Wind Farm

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 01/00380/FULCA, with what the planning evidence pack adds for this site.

Every application in Highland · Alerts for applications and incidents near here

  • 5 January 2005 Planning application submitted
  • 16 October 2006 Planning permission granted
  • 1 January 2007 Construction started
  • 1 July 2007 Operational

None found. The register holds no published incident that names Forss Wind Farm (Extension). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Forss Wind Farm (Extension) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Forss Wind Farm (Extension); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Forss Wind Farm (Extension)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 10 May 2016.
Where is Forss Wind Farm (Extension)?
9.5 km west of Thurso, Highland, United Kingdom (postcode KW14 7YB).