← Back to Somerset

Solar · United Kingdom

Higher Hatherleigh Solar Farm extension

Operator Private Developer

Operational1.5 MWData checked 16 November 2026Source record dated 14 July 2013

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Higher Hatherleigh Solar Farm extension is a 1.5 MW solar farm in Wincanton, Somerset, United Kingdom. Its planning application (12/03914/FUL) went to Somerset on 5 October 2012 and was granted on 21 February 2013. It has been operating since 28 March 2013. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 26 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 409 other sites and 276 energy sites within 40 km for Higher Hatherleigh Solar Farm extension

Members see the sites and incidents around this one, and every record behind them.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
1.5 MW (this record)
All phases
5 MW, the phases on the register added up
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Private Developer
Location
Land At Higher Hatherleigh FarmGrove LaneNorth CheritonTemplecombeSomerset, Somerset, United Kingdom
Planning authority
Somerset
Planning application
12/03914/FUL
First operating
2013

This record is 1.5 MW, one part of a site built in phases. With Higher Hatherleigh Solar Farm (3.5 MW) the phases on the register add up to 5 MW. Higher Hatherleigh Solar Farm

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 12/03914/FUL, with what the planning evidence pack adds for this site.

Every application in Somerset · Alerts for applications and incidents near here

  • 5 October 2012 Planning application submitted
  • 21 February 2013 Planning permission granted
  • 28 March 2013 Operational

None found. The register holds no published incident that names Higher Hatherleigh Solar Farm extension. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Higher Hatherleigh Solar Farm extension had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Higher Hatherleigh Solar Farm extension; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Higher Hatherleigh Solar Farm extension?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 14 July 2013.
Where is Higher Hatherleigh Solar Farm extension?
In Wincanton, Somerset, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).