Brains Solar Farm

Operator NextPower SPV 13 Limited

Awaiting Construction18.8 MWData checked 16 November 2026Source record dated 19 January 2022

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Brains Solar Farm is a 18.8 MW solar farm on the edge of Wincanton, Somerset, United Kingdom. Its planning application (21/02205/FUL) went to Somerset on 22 July 2021 and was granted on 10 January 2022. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 26 other energy sites within 10 km, 22 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Brains Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1524, Fire at a solar PV equipped house in Stoney Stratton, 14 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-15242025Fire at a solar PV equipped house in Stoney Stratton14 kmSignificant
EIR-15262025Solar panels catch fire on a retail or public building roof in South Petherton30 kmMinor
EIR-19642022Fire damages solar panels at Verwood farm during heatwave41 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
18.8 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
NextPower SPV 13 Limited
Location
Solar Site South Of Brains Farm Moor Lane Wincanton, Somerset, BA9, United Kingdom
Planning authority
Somerset
Planning application
21/02205/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 21/02205/FUL, with what the planning evidence pack adds for this site.

Every application in Somerset · Alerts for applications and incidents near here

  • 22 July 2021 Planning application submitted
  • 10 January 2022 Planning permission granted
  • 10 January 2025 Planning permission expired

None found. The register holds no published incident that names Brains Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Brains Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Brains Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Brains Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 19 January 2022.
Where is Brains Solar Farm?
On the edge of Wincanton, Somerset, United Kingdom (postcode BA9).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).