Solar · United Kingdom

High Meadow Farm

Operator Anesco · Owner Quanesco Midco Limited

Operational4 MWData checked 16 November 2026Source record dated 17 February 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

High Meadow Farm is a 4 MW solar farm 4.6 km north-west of Stockton-on-Tees, County Durham, United Kingdom. Its planning application (15/1826/FUL) went to Stockton-on-Tees on 22 July 2015 and was granted on 4 December 2015. It has been operating since 18 October 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 67 other energy sites within 10 km, 33 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 63 other sites and 379 energy sites within 40 km for High Meadow Farm

Members see the sites and incidents around this one, and every record behind them.

ANESCO LIMITED (07443091), active, since 2010. 1 outstanding charge on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Anesco
Owner
Quanesco Midco Limited
Location
Land at high Meadow Farm, Letch Lane, Carlton, Stockton, County Durham, TS21 1EE, United Kingdom
Planning authority
Stockton-on-Tees
Planning application
15/1826/FUL
First operating
2016

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 15/1826/FUL, with what the planning evidence pack adds for this site.

Every application in Stockton-on-Tees · Alerts for applications and incidents near here

  • 22 July 2015 Planning application submitted
  • 4 December 2015 Planning permission granted
  • 18 August 2016 Construction started
  • 18 October 2016 Operational

None found. The register holds no published incident that names High Meadow Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has High Meadow Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names High Meadow Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of High Meadow Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 17 February 2017.
Where is High Meadow Farm?
4.6 km north-west of Stockton-on-Tees, County Durham, United Kingdom (postcode TS21 1EE).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).