← Back to Cleveland
Planning pack for this site, £295Other options

Battery storage · United Kingdom

The Carrs - Meadow Farm Energy storage facility

Operator BayWa r.e. · Owner Meadow Farm Battery Limited

Awaiting Construction57 MWData checked 16 November 2026Source record dated 26 September 2023

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

The Carrs - Meadow Farm Energy storage facility is a 57 MW battery storage site 4.6 km north-west of Stockton-on-Tees, Cleveland, United Kingdom. Its planning application (23/0752/FUL) went to Stockton-on-Tees on 26 April 2023 and was granted on 21 September 2023. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 66 other energy sites within 10 km, 17 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for The Carrs - Meadow Farm Energy storage facility sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0584, Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells, 164 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells164 kmSignificant
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool167 kmMajor
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire322 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Stand-alone Storage)
Capacity
57 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
BayWa r.e.
Owner
Meadow Farm Battery Limited
Location
Se/O The Carrs, Fishing Lakes, Letch Lane, Carlton, Stockton on Tees, Cleveland, TS21 1ED, United Kingdom
Planning authority
Stockton-on-Tees
Planning application
23/0752/FUL

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/0752/FUL, with what the planning evidence pack adds for this site.

Every application in Stockton-on-Tees · Alerts for applications and incidents near here

  • 26 April 2023 Planning application submitted
  • 21 September 2023 Planning permission granted
  • 21 September 2026 Planning permission expired

None found. The register holds no published incident that names The Carrs - Meadow Farm Energy storage facility. If you know of one, report it (confidential reports are anonymised).

Has The Carrs - Meadow Farm Energy storage facility had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names The Carrs - Meadow Farm Energy storage facility; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of The Carrs - Meadow Farm Energy storage facility?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 26 September 2023.
Where is The Carrs - Meadow Farm Energy storage facility?
4.6 km north-west of Stockton-on-Tees, Cleveland, United Kingdom (postcode TS21 1ED).