Henbury Quarry

Operator Lightsource Renewable Energy · Owner Lightsource Holdings 3 Limited

Operational3.9 MWData checked 16 November 2026Source record dated 14 May 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Henbury Quarry is a 3.9 MW solar farm 4.2 km north-west of Broadstone, Dorset, United Kingdom. Its planning application (3/13/0948/FUL) went to Dorset on 20 September 2013 and was granted on 28 May 2014. It has been operating since 31 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 36 other energy sites within 10 km, 30 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 178 other sites and 219 energy sites within 40 km for Henbury Quarry

Members see the sites and incidents around this one, and every record behind them.

LIGHTSOURCE RENEWABLE ENERGY LIMITED (08946381), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
3.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lightsource Renewable Energy
Owner
Lightsource Holdings 3 Limited
Location
Land Adj To Henbury Quarry Henbury Plantation Old Market Road Corfe Mullen Wimborne Dorset BH21 3QZ, Dorset, BH21 3QZ, United Kingdom
Planning authority
Dorset
Planning application
3/13/0948/FUL
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 3/13/0948/FUL, with what the planning evidence pack adds for this site.

Every application in Dorset · Alerts for applications and incidents near here

  • 20 September 2013 Planning application submitted
  • 28 May 2014 Planning permission granted
  • 1 December 2014 Construction started
  • 31 March 2015 Operational

None found. The register holds no published incident that names Henbury Quarry. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Henbury Quarry had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Henbury Quarry; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Henbury Quarry?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 14 May 2015.
Where is Henbury Quarry?
4.2 km north-west of Broadstone, Dorset, United Kingdom (postcode BH21 3QZ).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).