Battery storage · United Kingdom
Post Farm, Lytchett Minster - Battery Energy Storage
Operator S4N Lytchett Limited · Owner S4n Lytchett LTD
Awaiting Construction32 MWData checked 16 November 2026Source record dated 13 January 2025
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Post Farm, Lytchett Minster - Battery Energy Storage is a 32 MW battery storage site 4 km south-west of Broadstone, Dorset, United Kingdom. Its planning application (P/FUL/2023/02819) went to Dorset on 16 May 2023 and was granted on 28 November 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 39 other energy sites within 10 km, 3 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Post Farm, Lytchett Minster - Battery Energy Storage changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Post Farm, Lytchett Minster - Battery Energy Storage sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0249, Smoke and fire incident at Battery Box, Pinhoe Road, Exeter, 101 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0249 | 2026 | Smoke and fire incident at Battery Box, Pinhoe Road, Exeter | 101 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 108 km | Significant |
| EIR-0109 | 2025 | Fire in single battery unit at Thurrock BESS under construction | 191 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Stand-alone Storage)
- Capacity
- 32 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- S4N Lytchett Limited
- Owner
- S4n Lytchett LTD
- Location
- Post Farm Lytchett Minster Poole, Dorset, BH16 6AB, United Kingdom
- Planning authority
- Dorset
- Planning application
- P/FUL/2023/02819
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for P/FUL/2023/02819, with what the planning evidence pack adds for this site.
Every application in Dorset · Alerts for applications and incidents near here
Timeline
- 16 May 2023 Planning application submitted
- 28 November 2024 Planning permission granted
- 28 November 2027 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Post Farm, Lytchett Minster - Battery Energy Storage. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Post Farm, Lytchett Minster - Battery Energy Storage had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Post Farm, Lytchett Minster - Battery Energy Storage; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Post Farm, Lytchett Minster - Battery Energy Storage?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 January 2025.
- Where is Post Farm, Lytchett Minster - Battery Energy Storage?
- 4 km south-west of Broadstone, Dorset, United Kingdom (postcode BH16 6AB).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).