← Back to Cumbria

Onshore wind · United Kingdom

Hellrigg Wind farm

Operator Npower Renewables

Operational9.2 MWData checked 16 November 2026Source record dated 15 March 2012

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Hellrigg Wind farm is a 9.2 MW wind farm 12 km west of Wigton, Cumbria, United Kingdom. Its planning application (2/2007/0076) went to Cumberland on 29 January 2007 and was granted on 11 December 2007. It has been operating since 14 September 2011. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 13 other energy sites within 10 km, 8 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 26 other sites and 175 energy sites within 40 km for Hellrigg Wind farm

Members see the sites and incidents around this one, and every record behind them.

NPOWER RENEWABLES AND CONSOLIDATION SERVICES LIMITED (02842079), dissolved, since 1993. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
9.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Npower Renewables
Location
Park Head FarmSillothCarlisle, Cumbria, United Kingdom
Planning authority
Cumberland
Planning application
2/2007/0076
First operating
2011
Turbines
4

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2/2007/0076, with what the planning evidence pack adds for this site.

Every application in Cumberland · Alerts for applications and incidents near here

  • 29 January 2007 Planning application submitted
  • 11 December 2007 Planning permission granted
  • 1 May 2011 Construction started
  • 14 September 2011 Operational

None found. The register holds no published incident that names Hellrigg Wind farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Hellrigg Wind farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Hellrigg Wind farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Hellrigg Wind farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 15 March 2012.
Where is Hellrigg Wind farm?
12 km west of Wigton, Cumbria, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).