Onshore wind · United Kingdom

Hedley Hope, Tow Law - Wind Turbines

Operator CleanEarth Energy Limited

Application Submitted31.5 MWData checked 16 November 2026Source record dated 18 December 2023

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Hedley Hope, Tow Law - Wind Turbines is a 31.5 MW wind farm 4.8 km north-west of Crook, County Durham, United Kingdom. Its planning application (DM/23/03047/FPA) went to County Durham on 7 November 2023. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 12 other energy sites within 10 km, 6 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Hedley Hope, Tow Law - Wind Turbines sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 49 comparable onshore wind incidents in the United Kingdom, nearest first. The nearest is EIR-1119, Wind turbine fire at Butterwick Wind Farm near Sedgefield, 24 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-11192019Wind turbine fire at Butterwick Wind Farm near Sedgefield24 kmMinor
EIR-08632017Fire destroys single turbine at Knabs Ridge wind farm near Harrogate86 kmSignificant
EIR-16242026Crane topples on Scout Moor wind farm project111 kmMajor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 46 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Onshore wind
Capacity
31.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
CleanEarth Energy Limited
Location
High Hedleyhope Farm High Hedleyhope Farm Road East Hedleyhope, County Durham, DL13 4BW, United Kingdom
Planning authority
County Durham
Planning application
DM/23/03047/FPA
Turbines
7, 149.9 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for DM/23/03047/FPA, with what the planning evidence pack adds for this site.

Every application in County Durham · Alerts for applications and incidents near here

  • 7 November 2023 Planning application submitted

None found. The register holds no published incident that names Hedley Hope, Tow Law - Wind Turbines. If you know of one, report it (confidential reports are anonymised).

Has Hedley Hope, Tow Law - Wind Turbines had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Hedley Hope, Tow Law - Wind Turbines; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Hedley Hope, Tow Law - Wind Turbines?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 18 December 2023.
Where is Hedley Hope, Tow Law - Wind Turbines?
4.8 km north-west of Crook, County Durham, United Kingdom (postcode DL13 4BW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).