Onshore wind · United Kingdom

High Hedley Hope 2 (Extension)

Operator EDF Energy

Operational5.2 MWData checked 16 November 2026Source record dated 6 May 2009

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

High Hedley Hope 2 (Extension) is a 5.2 MW wind farm 5.7 km north of Crook, County Durham, United Kingdom. Its planning application went to County Durham on 12 August 2004 and was granted on 6 July 2005. It has been operating since 25 June 2008. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 14 other energy sites within 10 km, 8 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 11 other sites and 459 energy sites within 40 km for High Hedley Hope 2 (Extension)

Members see the sites and incidents around this one, and every record behind them.

EDF ENERGY LIMITED (02366852), active, since 1989. 2 outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
5.2 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
EDF Energy
Location
High Hedley Farm, Tow Law, Bishop Auckland, County Durham, County Durham, United Kingdom
Planning authority
County Durham
First operating
2008
Turbines
4

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page, with what the planning evidence pack adds for this site.

Every application in County Durham · Alerts for applications and incidents near here

  • 12 August 2004 Planning application submitted
  • 6 July 2005 Planning permission granted
  • 25 June 2008 Operational

None found. The register holds no published incident that names High Hedley Hope 2 (Extension). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has High Hedley Hope 2 (Extension) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names High Hedley Hope 2 (Extension); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of High Hedley Hope 2 (Extension)?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 6 May 2009.
Where is High Hedley Hope 2 (Extension)?
5.7 km north of Crook, County Durham, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).