← Back to Durham
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Wadsworth

Operator ROOT-POWER (NORTH) LIMITED · Owner Root-Power (North) Limited

Awaiting Construction50 MWData checked 12 November 2026

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Wadsworth is a 50 MW battery storage site 3.4 km north-west of Bishop Auckland, Durham, United Kingdom. Its status in the public dataset is awaiting construction. There are 17 other energy sites within 10 km, 3 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

ROOT-POWER (NORTH) LIMITED (15286460), active, since 2023. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Wadsworth sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 163 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool163 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells177 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire330 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Battery)
Capacity
50 MW
Capacity figure from
Capacity Market register (EMR Delivery Body)
Status
Awaiting Construction (Capacity Market unit, delivery year 2028)
Operator
ROOT-POWER (NORTH) LIMITED
Owner
Root-Power (North) Limited
Location
Durham, DL14 7RL, United Kingdom

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

Alerts for applications and incidents near here

None found. The register holds no published incident that names Wadsworth. If you know of one, report it (confidential reports are anonymised).

Has Wadsworth had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Wadsworth; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Wadsworth?
Awaiting Construction, in the public dataset.
Where is Wadsworth?
3.4 km north-west of Bishop Auckland, Durham, United Kingdom (postcode DL14 7RL).

The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).