← Back to Bedfordshire

Solar · United Kingdom

Glebe Farm Solar Energy Park

Operator Vento Ludens

Operational15 MWData checked 16 November 2026Source record dated 15 April 2015

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Glebe Farm Solar Energy Park is a 15 MW solar farm 4.2 km south of Rushden, Bedfordshire, United Kingdom. Its planning application (13/00218/MAF) went to Bedford on 5 February 2013 and was granted on 3 June 2013. It has been operating since 31 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 34 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 8 other sites and 560 energy sites within 40 km for Glebe Farm Solar Energy Park

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
15 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Vento Ludens
Location
Land To The North East Glebe Farm Forty Foot Lane Souldrop, Bedfordshire, United Kingdom
Planning authority
Bedford
Planning application
13/00218/MAF
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 13/00218/MAF, with what the planning evidence pack adds for this site.

Every application in Bedford · Alerts for applications and incidents near here

  • 5 February 2013 Planning application submitted
  • 3 June 2013 Planning permission granted
  • 24 November 2014 Construction started
  • 31 March 2015 Operational

None found. The register holds no published incident that names Glebe Farm Solar Energy Park. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Glebe Farm Solar Energy Park had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Glebe Farm Solar Energy Park; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Glebe Farm Solar Energy Park?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 15 April 2015.
Where is Glebe Farm Solar Energy Park?
4.2 km south of Rushden, Bedfordshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).