← Back to Bedfordshire
Planning pack for this site, £295Other options

Solar · United Kingdom

Gooseys Lodge, Wymington Lane - Solar Farm

Operator Wykes Engineering Limited Goosey Lodge

Awaiting Construction10.4 MWData checked 16 November 2026Source record dated 13 May 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Gooseys Lodge, Wymington Lane - Solar Farm is a 10.4 MW solar farm 3.2 km south of Rushden, Bedfordshire, United Kingdom. Its planning application (23/02517/MAF) went to Bedford on 11 December 2023 and was granted on 2 May 2024. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 33 other energy sites within 10 km, 15 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Gooseys Lodge, Wymington Lane - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1448, Roof fire at new-build house with solar panels in Wellingborough, 8.5 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14482026Roof fire at new-build house with solar panels in Wellingborough8.5 kmSignificant
EIR-14932026Solar panels catch fire on Bedford warehouse roof17 kmMinor
EIR-15452024Fire involving solar panels on a building under construction in Kettering18 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
10.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Wykes Engineering Limited Goosey Lodge
Location
Gooseys Lodge, Wymington Lane, Wymington, Rushden, Bedfordshire, NN10 9LU, United Kingdom
Planning authority
Bedford
Planning application
23/02517/MAF

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 23/02517/MAF, with what the planning evidence pack adds for this site.

Every application in Bedford · Alerts for applications and incidents near here

  • 11 December 2023 Planning application submitted
  • 2 May 2024 Planning permission granted
  • 2 May 2028 Planning permission runs out

None found. The register holds no published incident that names Gooseys Lodge, Wymington Lane - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Gooseys Lodge, Wymington Lane - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Gooseys Lodge, Wymington Lane - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Gooseys Lodge, Wymington Lane - Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 13 May 2024.
Where is Gooseys Lodge, Wymington Lane - Solar Farm?
3.2 km south of Rushden, Bedfordshire, United Kingdom (postcode NN10 9LU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).