← Back to the applications
Full planning pack, launch price £145Other options

Planning application · Solar · Bedford

Gooseys Lodge, Wymington Lane - Solar Farm

Awaiting Construction10.4 MWApplication 23/02517/MAFSubmitted 11 December 2023Granted 2 May 2024

In the evidence packHidden: in the evidence packnearest refused scheme •• kmShown in the pack
Application number
23/02517/MAF
Planning authority
Bedford
County or area
Bedfordshire
Nation
England
Technology
Solar
Capacity
10.4 MW
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Wykes Engineering Limited Goosey Lodge
Location
Gooseys Lodge, Wymington Lane, Wymington, Rushden, NN10 9LU
  • 11 December 2023 Planning application submitted
  • 2 May 2024 Planning permission granted
  • 2 May 2028 Planning permission expired Date as recorded in the register

The pack for this site lists 89 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1448, Roof fire at new-build house with solar panels in Wellingborough, 8.5 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14482026Roof fire at new-build house with solar panels in Wellingborough8.5 kmSignificant
EIR-14932026Solar panels catch fire on Bedford warehouse roof17 kmMinor
EIR-15452024Fire involving solar panels on a building under construction in Kettering18 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 86 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack

Alerts for applications near here

An email when another battery, solar or wind application near NN10 9LU is added or decided, or an incident is recorded nearby. Free, nothing else, one click to stop.

By signing up you agree to the privacy policy. UK planning data is from the government's planning database, updated monthly.

Want to see a pack first? Download a sample pack (PDF). It is an example pack for a 50 MW battery project in Lincolnshire, with every section and the first rows of each table.

The site's own page has its map, the energy sites around it and anyone can follow it for changes. Every planning application. Every application in Bedford.

Data updated 3 August 2026 from the Renewable Energy Planning Database (DESNZ), published quarterly.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.