Onshore wind · United Kingdom
Edintore Wind Farm
Operator Vento Ludens
Operational18 MWData checked 16 November 2026Source record dated 31 October 2016
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Edintore Wind Farm is a 18 MW wind farm 19 km south of Buckie, Grampian, United Kingdom. Its planning application (10/02092/EIA) went to Moray on 11 December 2010 and was granted on appeal on 28 August 2012. It has been operating since 31 October 2016. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 20 other energy sites within 10 km, 7 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Edintore Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The site
- Technology
- Onshore wind
- Capacity
- 18 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Operational
- Operator or applicant
- Vento Ludens
- Location
- Edintore, Keith, Moray, Grampian, AB55 5PJ, United Kingdom
- Planning authority
- Moray
- Planning application
- 10/02092/EIA
- Appeal reference
- 12/00010/REF
- First operating
- 2016
- Turbines
- 6
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 10/02092/EIA, with what the planning evidence pack adds for this site.
Every application in Moray · Alerts for applications and incidents near here
Timeline
- 11 December 2010 Planning application submitted
- 14 December 2011 Planning permission refused
- 28 August 2012 Planning permission granted
- 28 August 2012 Appeal granted
- 24 September 2015 Construction started
- 31 October 2016 Operational
Incidents on the register at this site
None found. The register holds no published incident that names Edintore Wind Farm. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Edintore Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Edintore Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Edintore Wind Farm?
- Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 31 October 2016.
- Where is Edintore Wind Farm?
- 19 km south of Buckie, Grampian, United Kingdom (postcode AB55 5PJ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).