← Back to Grampian

Onshore wind · United Kingdom

Brown Muir Wind Farm (resubmission)

Operator Vento Ludens

Appeal Refused36 MWData checked 16 November 2026Source record dated 27 May 2016

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Brown Muir Wind Farm (resubmission) is a 36 MW wind farm 9.9 km south-east of Elgin, Grampian, United Kingdom. Its planning application (14/02090/EIA) went to Moray on 10 November 2014 and was refused on appeal on 26 May 2016. Its status in the Renewable Energy Planning Database (UK government) is appeal refused. There are 15 other energy sites within 10 km, 11 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 8 other sites and 123 energy sites within 40 km for Brown Muir Wind Farm (resubmission)

Members see the sites and incidents around this one, and every record behind them.

Technology
Onshore wind
Capacity
36 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Appeal Refused
Operator or applicant
Vento Ludens
Location
Land At Brown Muir Blackhills Elgin Moray, Grampian, United Kingdom
Planning authority
Moray
Planning application
14/02090/EIA
Appeal reference
PPA-300-2044
Turbines
12, 126 m to tip

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 14/02090/EIA, with what the planning evidence pack adds for this site.

Every application in Moray · Alerts for applications and incidents near here

  • 10 November 2014 Planning application submitted
  • 18 September 2015 Planning permission refused
  • 15 December 2015 Appeal lodged
  • 26 May 2016 Appeal refused

None found. The register holds no published incident that names Brown Muir Wind Farm (resubmission). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Brown Muir Wind Farm (resubmission) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Brown Muir Wind Farm (resubmission); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Brown Muir Wind Farm (resubmission)?
Appeal Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 27 May 2016.
Where is Brown Muir Wind Farm (resubmission)?
9.9 km south-east of Elgin, Grampian, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).