Planning pack for this site, £295Other options

Battery storage · United Kingdom

Blackhills Wind Farm

Operator Koehler Renewable Energy · Owner Koehler Renewable Energy GMBH

Application Submitted20 MWData checked 17 November 2026Source record dated 6 October 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Blackhills Wind Farm is a 20 MW battery storage site 7.9 km south-east of Elgin, Aberdeenshire, United Kingdom. Its planning application (ECU00005136) went to Scottish Government (S36) on 7 August 2025. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 12 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

KOEHLER RENEWABLE ENERGY UK LIMITED (SC710079), active, since 2021. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Blackhills Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 469 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool469 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells516 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire660 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
20 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Koehler Renewable Energy
Owner
Koehler Renewable Energy GMBH
Location
Blackhills Estate, Approximately 6km SE/O Elgin & 7km SW/O Fochabers, Fochabers, Aberdeenshire, IV30 8QU, United Kingdom
Planning authority
Scottish Government (S36)
Planning application
ECU00005136

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for ECU00005136, with what the planning evidence pack adds for this site.

Every application in Scottish Government (S36) · Alerts for applications and incidents near here

  • 7 August 2025 Planning application submitted

None found. The register holds no published incident that names Blackhills Wind Farm. If you know of one, report it (confidential reports are anonymised).

Has Blackhills Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Blackhills Wind Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Blackhills Wind Farm?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 6 October 2025.
Where is Blackhills Wind Farm?
7.9 km south-east of Elgin, Aberdeenshire, United Kingdom (postcode IV30 8QU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).