Battery storage · United Kingdom
Blackhills Wind Farm
Operator Koehler Renewable Energy · Owner Koehler Renewable Energy GMBH
Application Submitted20 MWData checked 17 November 2026Source record dated 6 October 2025
Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.
Blackhills Wind Farm is a 20 MW battery storage site 7.9 km south-east of Elgin, Aberdeenshire, United Kingdom. Its planning application (ECU00005136) went to Scottish Government (S36) on 7 August 2025. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 12 other energy sites within 10 km, 2 of them battery storage sites (hybrid battery and solar sites included). The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.
Get an email when Blackhills Wind Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, battery storage incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every battery storage incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
KOEHLER RENEWABLE ENERGY UK LIMITED (SC710079), active, since 2021. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Blackhills Wind Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 469 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-0638 | 2020 | Explosion and prolonged fire at Orsted battery storage site in Liverpool | 469 km | Major |
| EIR-0584 | 2026 | Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells | 516 km | Significant |
| EIR-0058 | 2025 | Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire | 660 km | Significant |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Battery storage (Co-located with RE)
- Capacity
- 20 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Submitted (Planning Application Submitted)
- Operator or applicant
- Koehler Renewable Energy
- Owner
- Koehler Renewable Energy GMBH
- Location
- Blackhills Estate, Approximately 6km SE/O Elgin & 7km SW/O Fochabers, Fochabers, Aberdeenshire, IV30 8QU, United Kingdom
- Planning authority
- Scottish Government (S36)
- Planning application
- ECU00005136
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for ECU00005136, with what the planning evidence pack adds for this site.
Every application in Scottish Government (S36) · Alerts for applications and incidents near here
Timeline
- 7 August 2025 Planning application submitted
Incidents on the register at this site
None found. The register holds no published incident that names Blackhills Wind Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Blackhills Wind Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Blackhills Wind Farm; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Blackhills Wind Farm?
- Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 6 October 2025.
- Where is Blackhills Wind Farm?
- 7.9 km south-east of Elgin, Aberdeenshire, United Kingdom (postcode IV30 8QU).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).