← Back to Co. Antrim

Solar · United Kingdom

Gibson Farm

Operator Lightsource Renewable Energy · Owner Lightsource Holdings 3 Limited

Operational6.4 MWData checked 16 November 2026Source record dated 4 September 2018

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Gibson Farm is a 6.4 MW solar farm 7.1 km west of Newtownabbey, Co. Antrim, United Kingdom. Its planning application (LA03/2015/0655/F) went to Antrim and Newtownabbey on 4 December 2015 and was granted on 26 July 2016. It has been operating since 28 February 2018. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 21 other energy sites within 10 km, 5 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 178 other sites and 151 energy sites within 40 km for Gibson Farm

Members see the sites and incidents around this one, and every record behind them.

LIGHTSOURCE RENEWABLE ENERGY LIMITED (08946381), active, since 2014. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Solar
Capacity
6.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Lightsource Renewable Energy
Owner
Lightsource Holdings 3 Limited
Location
Land at Gibson Farm, Sealstown Road, Newtownabbey, Co. Antrim, BT36 4QU, United Kingdom
Planning authority
Antrim and Newtownabbey
Planning application
LA03/2015/0655/F
First operating
2018

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for LA03/2015/0655/F, with what the planning evidence pack adds for this site.

Every application in Antrim and Newtownabbey · Alerts for applications and incidents near here

  • 4 December 2015 Planning application submitted
  • 26 July 2016 Planning permission granted
  • 11 December 2017 Construction started
  • 28 February 2018 Operational

None found. The register holds no published incident that names Gibson Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Gibson Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Gibson Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Gibson Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 4 September 2018.
Where is Gibson Farm?
7.1 km west of Newtownabbey, Co. Antrim, United Kingdom (postcode BT36 4QU).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).