← Back to Co. Antrim

Onshore wind · United Kingdom

Power Generation Development in Templepatrick

Operator Private Developer

Application Refused0.3 MWData checked 16 November 2026Source record dated 3 May 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Power Generation Development in Templepatrick is a 0.3 MW wind farm 9.7 km south-west of Ballyclare, Co. Antrim, United Kingdom. Its planning application (LA03/2023/0051/F) went to Antrim and Newtownabbey on 1 February 2023 and was refused on 30 April 2024. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 22 other energy sites within 10 km, 13 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 409 other sites and 159 energy sites within 40 km for Power Generation Development in Templepatrick

Members see the sites and incidents around this one, and every record behind them.

PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
0.3 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Refused (Planning Permission Refused)
Operator or applicant
Private Developer
Location
520m East of No 70 Lylehill Road, Templepatrick, Co. Antrim, BT39 0HL, United Kingdom
Planning authority
Antrim and Newtownabbey
Planning application
LA03/2023/0051/F
Turbines
1

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for LA03/2023/0051/F, with what the planning evidence pack adds for this site.

Every application in Antrim and Newtownabbey · Alerts for applications and incidents near here

  • 1 February 2023 Planning application submitted
  • 30 April 2024 Planning permission refused

None found. The register holds no published incident that names Power Generation Development in Templepatrick. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Power Generation Development in Templepatrick had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Power Generation Development in Templepatrick; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Power Generation Development in Templepatrick?
Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 3 May 2024.
Where is Power Generation Development in Templepatrick?
9.7 km south-west of Ballyclare, Co. Antrim, United Kingdom (postcode BT39 0HL).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).