Fordoun Sawmill Solar Array

Operator Green Power (International) Limited

Awaiting Construction1.5 MWData checked 16 November 2026Source record dated 29 October 2024

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Fordoun Sawmill Solar Array is a 1.5 MW solar farm 15 km south-west of Stonehaven, Grampian, United Kingdom. Its planning application (APP/2021/0050) went to Aberdeenshire on 22 January 2021 and was granted on 13 May 2021. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 40 other energy sites within 10 km, 6 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Fordoun Sawmill Solar Array sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1476, House fire reported to have started on solar panels in Carnoustie, 47 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-14762026House fire reported to have started on solar panels in Carnoustie47 kmSignificant
EIR-12382019Leak from solar heating system at Carnegie Leisure Centre Dunfermline112 kmMinor
EIR-20162022Solar panel fire evacuates Hawick High School165 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
1.5 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Green Power (International) Limited
Location
Fordoun Sawmill, Fordoun, Laurencekirk, Grampian, AB30 1JR, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2021/0050

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2021/0050, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

  • 22 January 2021 Planning application submitted
  • 13 May 2021 Planning permission granted

None found. The register holds no published incident that names Fordoun Sawmill Solar Array. If you know of one, report it (confidential reports are anonymised).

Has Fordoun Sawmill Solar Array had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Fordoun Sawmill Solar Array; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Fordoun Sawmill Solar Array?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 29 October 2024.
Where is Fordoun Sawmill Solar Array?
15 km south-west of Stonehaven, Grampian, United Kingdom (postcode AB30 1JR).