← Back to Grampian

Onshore wind · United Kingdom

Herscha Wind energy Project (Extension)

Operator Orkney Sustainable Energy

Planning Permission Expired1.6 MWData checked 16 November 2026Source record dated 21 September 2020

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Herscha Wind energy Project (Extension) is a 1.6 MW wind farm 15 km west of Stonehaven, Grampian, United Kingdom. Its planning application (APP/2013/0587) went to Aberdeenshire on 4 March 2013 and was granted on 20 May 2015. Its status in the Renewable Energy Planning Database (UK government) is planning permission expired. There are 32 other energy sites within 10 km, 18 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 6 other sites and 189 energy sites within 40 km for Herscha Wind energy Project (Extension)

Members see the sites and incidents around this one, and every record behind them.

ORKNEY SUSTAINABLE ENERGY LIMITED (SC160432), active, since 1995. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Technology
Onshore wind
Capacity
1.6 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Planning Permission Expired
Operator or applicant
Orkney Sustainable Energy
Location
Herscha HIll (Land to North of)Newland CottageAuchenblae Laurencekirk, Grampian, United Kingdom
Planning authority
Aberdeenshire
Planning application
APP/2013/0587
Turbines
2

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for APP/2013/0587, with what the planning evidence pack adds for this site.

Every application in Aberdeenshire · Alerts for applications and incidents near here

  • 4 March 2013 Planning application submitted
  • 20 May 2015 Planning permission granted
  • 9 March 2021 Planning permission expired

None found. The register holds no published incident that names Herscha Wind energy Project (Extension). If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Herscha Wind energy Project (Extension) had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Herscha Wind energy Project (Extension); it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Herscha Wind energy Project (Extension)?
Planning Permission Expired, in the Renewable Energy Planning Database (UK government), where it last changed on 21 September 2020.
Where is Herscha Wind energy Project (Extension)?
15 km west of Stonehaven, Grampian, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).