Onshore wind · United Kingdom
Boy's Hill Wind Cluster
Operator Private Developer
Application Refused6.9 MWData checked 16 November 2026Source record dated 14 February 2014
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Boy's Hill Wind Cluster is a 6.9 MW wind farm 15 km south of Banchory, Grampian, United Kingdom. Its planning application (APP/2012/4218) went to Aberdeenshire on 10 January 2013 and was refused on 21 October 2013. Its status in the Renewable Energy Planning Database (UK government) is application refused. There are 26 other energy sites within 10 km, 12 of them wind farms. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.
Get an email when Boy's Hill Wind Cluster changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, onshore wind incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every wind turbine incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
Members see the sites and incidents around this one, and every record behind them.
The company behind this site
PRIVATE DEVELOPER NETWORK LIMITED (09386318), dissolved, since 2015. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
The site
- Technology
- Onshore wind
- Capacity
- 6.9 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Application Refused (Planning Permission Refused)
- Operator or applicant
- Private Developer
- Location
- Land to North West of Denside, Glenfarquhar, Auchenblae, Laurencekirk, Grampian, AB30 1UJ, United Kingdom
- Planning authority
- Aberdeenshire
- Planning application
- APP/2012/4218
- Turbines
- 3
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for APP/2012/4218, with what the planning evidence pack adds for this site.
Every application in Aberdeenshire · Alerts for applications and incidents near here
Timeline
- 10 January 2013 Planning application submitted
- 21 October 2013 Planning permission refused
Incidents on the register at this site
None found. The register holds no published incident that names Boy's Hill Wind Cluster. If you know of one, report it (confidential reports are anonymised).
Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.
Questions
- Has Boy's Hill Wind Cluster had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Boy's Hill Wind Cluster; it holds 63 incidents at wind farms in the United Kingdom.
- What is the status of Boy's Hill Wind Cluster?
- Application Refused, in the Renewable Energy Planning Database (UK government), where it last changed on 14 February 2014.
- Where is Boy's Hill Wind Cluster?
- 15 km south of Banchory, Grampian, United Kingdom (postcode AB30 1UJ).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).