← Back to Islands
Planning pack for this site, £295Other options

Battery storage · United Kingdom

Greentoft, Neven Point, Eday - Wind Turbines & BESS

Operator Green Power (International) Limited

Application Submitted10 MWData checked 16 November 2026Source record dated 11 August 2025

Watch this siteIts outage notices and incidents, what it earns and where it ranks, in your workspace and by email. 7 days free, no card.

Greentoft, Neven Point, Eday - Wind Turbines & BESS is a 10 MW battery storage site 29 km north-east of Kirkwall, Islands, United Kingdom. Its planning application (25/203/TPPMAJ) went to Orkney Islands on 23 June 2025. Its status in the Renewable Energy Planning Database (UK government) is application submitted. There are 6 other energy sites within 10 km, one of them a battery storage site. The register holds no incident at this site. It holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom, and 199 worldwide.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Greentoft, Neven Point, Eday - Wind Turbines & BESS sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 5 comparable battery incidents in the United Kingdom, grid-scale only, nearest first. The nearest is EIR-0638, Explosion and prolonged fire at Orsted battery storage site in Liverpool, 649 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-06382020Explosion and prolonged fire at Orsted battery storage site in Liverpool649 kmMajor
EIR-05842026Fire in a battery container at Rufford Colliery BESS, Rainworth; owner attributes it to a short circuit in NMC cells686 kmSignificant
EIR-00582025Fire in two battery containers at Cirencester Hybrid Solar Farm, Gloucestershire837 kmSignificant
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 2 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Battery storage (Co-located with RE)
Capacity
10 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Application Submitted (Planning Application Submitted)
Operator or applicant
Green Power (International) Limited
Location
Greentoft, Neven Point, Eday, Orkney, Islands, KW17 2AB, United Kingdom
Planning authority
Orkney Islands
Planning application
25/203/TPPMAJ

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 25/203/TPPMAJ, with what the planning evidence pack adds for this site.

Every application in Orkney Islands · Alerts for applications and incidents near here

  • 23 June 2025 Planning application submitted

None found. The register holds no published incident that names Greentoft, Neven Point, Eday - Wind Turbines & BESS. If you know of one, report it (confidential reports are anonymised).

Has Greentoft, Neven Point, Eday - Wind Turbines & BESS had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Greentoft, Neven Point, Eday - Wind Turbines & BESS; it holds 14 incidents at battery storage sites (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Greentoft, Neven Point, Eday - Wind Turbines & BESS?
Application Submitted, in the Renewable Energy Planning Database (UK government), where it last changed on 11 August 2025.
Where is Greentoft, Neven Point, Eday - Wind Turbines & BESS?
29 km north-east of Kirkwall, Islands, United Kingdom (postcode KW17 2AB).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).