Solar · United Kingdom

Exning

Operator Vortex (formerly Sun Edison)

Operational29.9 MWData checked 16 November 2026Source record dated 2 February 2017

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Exning is a 29.9 MW solar farm 3.2 km south-east of Burwell, Cambridgeshire, United Kingdom. Its planning application (13/00878/ESF) went to East Cambridgeshire on 22 October 2013 and was granted on 4 July 2014. It has been operating since 27 March 2015. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 28 other energy sites within 10 km, 13 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

The operator's 1 other site and 288 energy sites within 40 km for Exning

Members see the sites and incidents around this one, and every record behind them.

Technology
Solar
Capacity
29.9 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Vortex (formerly Sun Edison)
Location
Land Off Heath Road, Burwell, Cambridgeshire, United Kingdom
Planning authority
East Cambridgeshire
Planning application
13/00878/ESF
First operating
2015

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 13/00878/ESF, with what the planning evidence pack adds for this site.

Every application in East Cambridgeshire · Alerts for applications and incidents near here

  • 22 October 2013 Planning application submitted
  • 4 July 2014 Planning permission granted
  • 1 November 2014 Construction started
  • 27 March 2015 Operational

None found. The register holds no published incident that names Exning. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Exning had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Exning; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Exning?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 2 February 2017.
Where is Exning?
3.2 km south-east of Burwell, Cambridgeshire, United Kingdom.

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).