Edinbane Wind Farm is a 41.4 MW wind farm Highland, United Kingdom. Its planning application (02/00089/FULSL) went to Highland on 28 February 2002 and was granted on 16 May 2007. It has been operating since 21 June 2010. Its status in the Renewable Energy Planning Database (UK government) is operational. There are 7 other energy sites within 10 km. The register holds no incident at this site. It holds 63 incidents at wind farms in the United Kingdom, and 362 worldwide.

The operator's 27 other sites and 11 energy sites within 40 km for Edinbane Wind Farm

Members see the sites and incidents around this one, and every record behind them.

7 Oct2 Nov
WholesaleBalancing mechanism

Full revenue and market view The pounds behind each bar, any period back to 2021, where it ranks against every site like it, who trades it, and a side-by-side with any other site.

30 settled days to 4 Nov: 3,051 MWh, running 64% of half hours, peak 20 MW of 41, load factor 10%. Members see what that output was worth at the market index price, half hour by half hour, and the rate per MW a year.

A day out costs this site about £18,375 at its earnings over the last 30 settled days (wholesale at the market index price). A figure from the market, not a claim: what the site earned, averaged, is what a day out forgoes.

Contains BMRS data © Elexon Limited copyright and database right (datasets B1610 and MID, the interim settlement run). Read each morning; a settled figure can be revised in later runs.

Technology
Onshore wind
Capacity
41.4 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Operational
Operator or applicant
Vattenfall
Location
Cruachan Brinn Mhicaskill, Edinbane, Portree, Highlands, Highland, IV51 9PW, United Kingdom
Planning authority
Highland
Planning application
02/00089/FULSL
First operating
2010
Turbines
18

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 02/00089/FULSL, with what the planning evidence pack adds for this site.

Every application in Highland · Alerts for applications and incidents near here

  • 28 February 2002 Planning application submitted
  • 16 May 2007 Planning permission granted
  • 1 August 2008 Construction started
  • 21 June 2010 Operational

None found. The register holds no published incident that names Edinbane Wind Farm. If you know of one, report it (confidential reports are anonymised).

Own, insure or lend to this site or others like it? A portfolio safety record checks every site in a list against the register, free; the paid records add the site, operator, cause, downtime and loss behind each incident.

Has Edinbane Wind Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Edinbane Wind Farm; it holds 63 incidents at wind farms in the United Kingdom.
What is the status of Edinbane Wind Farm?
Operational, in the Renewable Energy Planning Database (UK government), where it last changed on 2 December 2014.
Where is Edinbane Wind Farm?
Highland, United Kingdom (postcode IV51 9PW).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts.