Solar · United Kingdom
Duckinfield Farm, Hurst Lane - Solar Farm
Operator Noventum Power Limited · Owner O.Y. Nofar Energy Limited
Awaiting Construction10 MWData checked 16 November 2026Source record dated 8 June 2026
Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.
Duckinfield Farm, Hurst Lane - Solar Farm is a 10 MW solar farm on the edge of Culcheth, Cheshire, United Kingdom. Its planning application (2025/00969/FULM) went to Warrington on 14 July 2025 and was granted on 22 May 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 71 other energy sites within 10 km, 39 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.
Get an email when Duckinfield Farm, Hurst Lane - Solar Farm changes
Free. An email when its status changes: a planning decision, building starting, going live or closing. And each Monday, solar PV incidents in the United Kingdom. No account needed; unsubscribe in one click.
Confirm your email and every solar incident on the register arrives at once as a spreadsheet (CSV), free.
Get a free sample brief Three complete verified records and the incidents-per-GW table, by email within a minute.
We will also email you about the register's paid records and plans, at most once a week and three times in all. You can stop these at any time. By signing up you agree to the privacy policy.
The company behind this site
NOVENTUM POWER LIMITED (13731615), active, since 2021. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.
Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.
Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Duckinfield Farm, Hurst Lane - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.
Get the evidence pack for this site, £295 See a sample pack (PDF)
Preview of the planning evidence pack for this site
The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 3.2 km from this site.
| Reference | Year | Incident | From the site | Severity |
|---|---|---|---|---|
| EIR-1244 | 2018 | Fire reported to have started in solar panels at Westleigh primary school | 3.2 km | Significant |
| EIR-1485 | 2026 | Faulty solar panel wiring sparks house fire in Stoke-on-Trent | 49 km | Minor |
| EIR-1546 | 2025 | Solar panel isolation switch overheats in roof fire at a house in Bucknall | 54 km | Minor |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
| •••••••• | •••• | •••••••••••••••••••••••••••••• | •••• | •••••• |
The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.
The map
Summary for this site
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
Paragraphs for the planning statement
This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.
In the full packThe site
- Technology
- Solar
- Capacity
- 10 MW
- Capacity figure from
- Renewable Energy Planning Database (UK government)
- Status
- Awaiting Construction (Planning Permission Granted)
- Operator or applicant
- Noventum Power Limited
- Owner
- O.Y. Nofar Energy Limited
- Location
- Duckinfield Farm Hurst Lane, Culcheth And Glazebury, Cheshire, WA3 5QA, United Kingdom
- Planning authority
- Warrington
- Planning application
- 2025/00969/FULM
View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.
The planning application page for 2025/00969/FULM, with what the planning evidence pack adds for this site.
Every application in Warrington · Alerts for applications and incidents near here
Timeline
- 14 July 2025 Planning application submitted
- 22 May 2026 Planning permission granted
- 22 May 2029 Planning permission runs out
Incidents on the register at this site
None found. The register holds no published incident that names Duckinfield Farm, Hurst Lane - Solar Farm. If you know of one, report it (confidential reports are anonymised).
Questions
- Has Duckinfield Farm, Hurst Lane - Solar Farm had a fire or other incident?
- None is on the register as of 21 November 2026. The register holds no published incident that names Duckinfield Farm, Hurst Lane - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
- What is the status of Duckinfield Farm, Hurst Lane - Solar Farm?
- Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 June 2026.
- Where is Duckinfield Farm, Hurst Lane - Solar Farm?
- On the edge of Culcheth, Cheshire, United Kingdom (postcode WA3 5QA).
Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).