Solar · United Kingdom

Duckinfield Farm, Hurst Lane - Solar Farm

Operator Noventum Power Limited · Owner O.Y. Nofar Energy Limited

Awaiting Construction10 MWData checked 16 November 2026Source record dated 8 June 2026

Watch this siteIts outage notices and incidents, in your workspace and by email. 7 days free, no card.

Duckinfield Farm, Hurst Lane - Solar Farm is a 10 MW solar farm on the edge of Culcheth, Cheshire, United Kingdom. Its planning application (2025/00969/FULM) went to Warrington on 14 July 2025 and was granted on 22 May 2026. Its status in the Renewable Energy Planning Database (UK government) is awaiting construction. There are 71 other energy sites within 10 km, 39 of them solar farms (hybrid battery and solar sites included). The register holds no incident at this site. It holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom, and 480 worldwide.

NOVENTUM POWER LIMITED (13731615), active, since 2021. No outstanding charges on the register. Members see the charges register: each charge, when it was created and the lender it is in favour of.

Source: Companies House, matched by the operator's name. If this is the wrong company, tell the editor.

Preparing, reviewing or responding to a planning application for a site like this? The planning evidence pack for Duckinfield Farm, Hurst Lane - Solar Farm sets out every comparable incident for this project, with sources. £295, by email in minutes; the order form arrives filled in from this record.

Get the evidence pack for this site, £295 See a sample pack (PDF)

The pack for this site lists 104 comparable solar incidents in the United Kingdom, nearest first. The nearest is EIR-1244, Fire reported to have started in solar panels at Westleigh primary school, 3.2 km from this site.

ReferenceYearIncidentFrom the siteSeverity
EIR-12442018Fire reported to have started in solar panels at Westleigh primary school3.2 kmSignificant
EIR-14852026Faulty solar panel wiring sparks house fire in Stoke-on-Trent49 kmMinor
EIR-15462025Solar panel isolation switch overheats in roof fire at a house in Bucknall54 kmMinor
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••
••••••••••••••••••••••••••••••••••••••••••••••••••••

The first 3 rows as the pack shows them. The other 101 are in the pack, each with its distance, sources and the fire service guidance it bears on.

The map

Summary for this site

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

Paragraphs for the planning statement

This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack. This part of the pack is written for this site and opens with the pack.

In the full pack
Technology
Solar
Capacity
10 MW
Capacity figure from
Renewable Energy Planning Database (UK government)
Status
Awaiting Construction (Planning Permission Granted)
Operator or applicant
Noventum Power Limited
Owner
O.Y. Nofar Energy Limited
Location
Duckinfield Farm Hurst Lane, Culcheth And Glazebury, Cheshire, WA3 5QA, United Kingdom
Planning authority
Warrington
Planning application
2025/00969/FULM

View on OpenStreetMap. The larger dot is this site; the others are sites within 40 km.

The planning application page for 2025/00969/FULM, with what the planning evidence pack adds for this site.

Every application in Warrington · Alerts for applications and incidents near here

  • 14 July 2025 Planning application submitted
  • 22 May 2026 Planning permission granted
  • 22 May 2029 Planning permission runs out

None found. The register holds no published incident that names Duckinfield Farm, Hurst Lane - Solar Farm. If you know of one, report it (confidential reports are anonymised).

Has Duckinfield Farm, Hurst Lane - Solar Farm had a fire or other incident?
None is on the register as of 21 November 2026. The register holds no published incident that names Duckinfield Farm, Hurst Lane - Solar Farm; it holds 104 incidents at solar farms (hybrid battery and solar sites included) in the United Kingdom.
What is the status of Duckinfield Farm, Hurst Lane - Solar Farm?
Awaiting Construction, in the Renewable Energy Planning Database (UK government), where it last changed on 8 June 2026.
Where is Duckinfield Farm, Hurst Lane - Solar Farm?
On the edge of Culcheth, Cheshire, United Kingdom (postcode WA3 5QA).

Contains public sector information licensed under the Open Government Licence v3.0 (Renewable Energy Planning Database, Department for Energy Security and Net Zero). The dataset. The register adds only the incidents and the counts. Nearest town: GeoNames (CC BY 4.0).